CAPITAL CAMPAIGN
2023-2026
Since 1880, Bethesda Lutheran has been sharing the good news of Christ in Moorhead and around the world. While our facility and faces have changed during this time, one thing remains the same…our commitment to bear witness to the love and grace of Jesus Christ. Desiring to enhance our mission and ministry, the Building on Faith capital campaign program will allow us to move into a bright and promising future so that we can continue to do God’s work locally and globally.
PROJECT DESCRIPTION
PHASE 1
IN PROGRESS
ROOFING
To stop leaks during heavy rainfall and spring melting, six projects will be undertaken:
+Repair and patch existing rubber membrane roof areas
+Re-side leaking brick walls above flat roof areas above narthex
+Replace upper clearstory windows (above chancel)
+Replace exterior cedar shake siding at sanctuary
+Replace roof flashing caps at parapets
+Replace exterior soffits with metal soffits
PROPOSED DRAWINGS
SIGN REFURBISH
Upgrading the church sign on 40th Avenue with fresh paint, updated logos, & replacement of the lettering & covering will make our sign both inviting & welcoming to all who pass by.
CAMPAIGN COSTS
Costs associated with the campaign will be covered through the proceeds of “Building on Faith.”
DOOR
SECURITY
A Secure Access Control (SAC) system will be installed, which will include an automated door controller, video panel, & monitoring handset. The SAC system will be programmable to lock & unlock at pre-established times as well as have Bluetooth capabilities for remote operation.
AUDIO | VISUAL
The current audio/visual system in our sanctuary is approx. 50 years old, making it sub-par and unreliable. New equipment will enhance our worship experience both in person & online.
OPERATING SHORTFALL
Campaign funds will be set aside to cover shortfalls to the General Fund for 2023-2024.
10% TITHE
Financial gifts from the campaign will be given to Table of Mercy & Crossroads MSUM to offer mission support in our community.
PHASE 2
PARKING LOT
RESURFACE
Continued maintenance of the parking lot is necessary to preserve the asphalt.
COURTYARD BRICK WALL
The courtyard wall enclosures are leaning & crumbling in some places. Repairs will be made to stabilize the walls & create a safer environment in the courtyard.
GROUND LEVEL WINDOWS
The ground-level windows will be replaced with new insulated glass aluminum windows for energy efficiency.
KITCHEN CEILING
There are stained & missing ceiling tiles throughout the kitchen & narthex. New tiles would be installed throughout the kitchen & stained tiles would be replaced in the narthex.
SANCTUARY CARPET
The current carpet is old, stained, burned, & frayed. New flooring in the sanctuary will keep our worship space looking fresh & inviting.
10% TITHE
Financial gifts from the campaign will be given to Table of Mercy and Crossroads MSUM to offer mission support in our community.
BALCONY GUARDRAILS
Our balcony guardrails do not meet today’s safety standards. Upgrades will be made to bring the guardrails up to code, making the balcony safe for children & adults.